Building and Commissioning an Electrical Substation (TNB Contractors)
Introduction
The objective of the course is to provide theoretical and practical training regarding the process of building a Division Substation up to 22kV, from the procuring of the substation to successfully getting the substation on the grid. The focus will be 80% practical and 20% of theory and case studies. The course will refer to the latest manual and guidelines used by TNB on the building of substations.
This course is beneficial for those who are involved in the building and commissioning of a fully functioning substation as participants will learn how to do so correctly and safely.
TNB DISTRIBUTION (TNB Contractor)
Target Participant
ILSAS BANGI
Venue
5 DAYS
Duration
Objective
At the end of the course, participants will be able to:
- Identify the types of substations and their main functions
- Follow the civil specifications for the building of substations
- Describe a substation’s site requirements and specifications
- Perform the transportation and unloading of a substation according to the correct guidelines
- Perform the installation of a substation’s major components according to the correct guidelines
- Perform the testing of a substation’s major components according to the correct guidelines
- Write a work completion report with the correct format
Agenda
INTRODUCTION TO THE DIVISION ASSISTANCE BUILDING WORKS
- Specification of the Substation Building
- Preparation of Substation Main Equipment Site
- Work of Transporting & Unloading Substation Equipment
INSTALLATION OF RMU SWITCH TOOL
- Types of RMU Switch Tools
- Site Preparation and RMU Installation
- RMU Testing & Assignment
- Work to Dismantle RMU
- Work On Installation of the Boiler
INSTALLATION OF SWITCH TOOLS CIRCUIT BREAKER AND MODIFIERS
- Provision of Installation Work Equipment and Safety Measures
- Types of Circuit Breaker Types and Their Specifications
- Site Preparation and a Circuit Breaker Installation
- Development of Transformer Site
- Installation of Transformers with Accessories
INSTALLATION OF LOW VOLTAGE DISTRIBUTION BOARD
- Preparation of Installation Work Equipment and Safety Measures
- Site Preparation and PPVR Installation
- Installation of AT Supply System
- Battery Assembly
TESTING AND ASSIGNING CIRCUIT BREAKERS
- Perform IR Testing, Continuity, CRT, Power Frequency Withstand Test & Vacuum Interrupter Test
- Filling Test Format
TESTING OF SWITCH TOOLS AND PPVR
- Test Equipment Setup and Safety Measures
- Perform IR Testing, Continuity, Winding Resistance & Turn Ratio for Variables
- Testing and Managing the PPVR
SUBSTITUTION REFINERY WORK
- Reorganization of Work Equipment
CASE STUDIES
What people say?
Related products
-
Uncategorized
Emotional Intelligence
-
Uncategorized
Smart Meter and Advanced Metering Infrastructure