DISTRIBUTION PROJECT & CONSTRUCTION MANAGEMENT –  Module 1

DISTRIBUTION PROJECT & CONSTRUCTION MANAGEMENT – Module 1
Distribution

Overview:
Objective of Power Distribution System is to deliver the electrical power to customers in safe, reliable and most economical way. Several parameters of electricity supply such as frequency, continuity of supply, voltage level etc. should be within allowable limits to ensure that customer obtains satisfactory performance for his electrical equipment while ensuring that the demands of the customers are met continuously. The capital and operating costs of doing so should be kept at the most optimum level, taking into account the total cost of ownership and losses in the system.
 
This course details out and apply the fundamental engineering processes & guidelines to manage 11 kV project correctly. We referring to the overview of project & constructions which highlight the types of distribution project and related implementation approach in TNNB and ensured that compliance to Minimum Service Level (MSL) for On-Time supply connection.

Objective:
Upon completion of the lesson, trainees will be able to:
·         Apply fundamental engineering processes & guidelines to manage 11kV project correctly.      

Duration: 4


Request Form





Available Sessions

Upon Request


Other Information
Target Participant: E07-E15 (Distribution planning and constructural)
Languages: English, Malay


Price

Upon Request



Related Course

RM 3.6K
PEMASANGAN DAN PENGUJIAN METER OPC
Distribution

3

View Details

Overview:
Objective of Power Distribution System is to deliver the electrical power to customers in safe, reliable and most economical way. Several parameters of electricity supply such as frequency, continuity of supply, voltage level etc. should be within allowable limits to ensure that customer obtains satisfactory performance for his electrical equipment while ensuring that the demands of the customers are met continuously. The capital and operating costs of doing so should be kept at the most optimum level, taking into account the total cost of ownership and losses in the system.
 
This course details out and apply the fundamental engineering processes & guidelines to manage 11 kV project correctly. We referring to the overview of project & constructions which highlight the types of distribution project and related implementation approach in TNNB and ensured that compliance to Minimum Service Level (MSL) for On-Time supply connection.
Objective:
Upon completion of the lesson, trainees will be able to:
·         Apply fundamental engineering processes & guidelines to manage 11kV project correctly.      

Target Participant: E07-E15 (Distribution planning and constructural)
Duration: 4
Language: English, Malay

RM 3.6K
OVERVIEW OF SMART METER AND ADVANCE METERING SYSTEM
Distribution

2

View Details

Overview:
Objective of Power Distribution System is to deliver the electrical power to customers in safe, reliable and most economical way. Several parameters of electricity supply such as frequency, continuity of supply, voltage level etc. should be within allowable limits to ensure that customer obtains satisfactory performance for his electrical equipment while ensuring that the demands of the customers are met continuously. The capital and operating costs of doing so should be kept at the most optimum level, taking into account the total cost of ownership and losses in the system.
 
This course details out and apply the fundamental engineering processes & guidelines to manage 11 kV project correctly. We referring to the overview of project & constructions which highlight the types of distribution project and related implementation approach in TNNB and ensured that compliance to Minimum Service Level (MSL) for On-Time supply connection.
Objective:
Upon completion of the lesson, trainees will be able to:
·         Apply fundamental engineering processes & guidelines to manage 11kV project correctly.      

Target Participant: E07-E15 (Distribution planning and constructural)
Duration: 4
Language: English, Malay

RM 3.6K
KENDALIAN PENCAWANG 33kV Modul 3 – Diagnostik Kerosakan Sistem SUBSTATION OPERATION 33kV Module 3 – System Fault Diagnosis
Distribution

3

View Details

Overview:
Objective of Power Distribution System is to deliver the electrical power to customers in safe, reliable and most economical way. Several parameters of electricity supply such as frequency, continuity of supply, voltage level etc. should be within allowable limits to ensure that customer obtains satisfactory performance for his electrical equipment while ensuring that the demands of the customers are met continuously. The capital and operating costs of doing so should be kept at the most optimum level, taking into account the total cost of ownership and losses in the system.
 
This course details out and apply the fundamental engineering processes & guidelines to manage 11 kV project correctly. We referring to the overview of project & constructions which highlight the types of distribution project and related implementation approach in TNNB and ensured that compliance to Minimum Service Level (MSL) for On-Time supply connection.
Objective:
Upon completion of the lesson, trainees will be able to:
·         Apply fundamental engineering processes & guidelines to manage 11kV project correctly.      

Target Participant: E07-E15 (Distribution planning and constructural)
Duration: 4
Language: English, Malay

Human Resource Minister - Training Provider Award 2007
Role Model Company 2013 for Electrical Training Programmes by Manpower Department (JTM)
Energy Industry Award: Training Institution Excellence 2011

TNB Integrated Learning Solution Sdn Bhd - ILSAS
Jalan IKRAM-UNITEN, Karung Berkunci 205,
43650 Bandar Baru Bangi, Selangor, MALAYSIA

T: (+6) 03-8922 7222 F: (+6) 03-8926 4437 E: infoilsas@tnb.com.my

© 2018 TNB ILSAS