Courses

Live Substation Preparation Drawing For Team Leader
Transmission

3 Days

View Details

Overview:
In this training program, participant will learn about details on AutoCAD and Visio System for technical drawing. Participant will be given a few case study regarding their works and will discuss details on solutions during this program. There will be explanation on measurement procedure and inaccurate measurement of safety & working clearance. This program can helps to reduce any tripping that cause by working clearance.
Objective:
After attending this training program, participants will be able to:

• Do maintenance with correct procedure and avoid tripping cases because of Live Working Clearance.
• Be more competent during preparation of drawing work.

Target Participant: Engineers Technician
Duration: 3 Days
Language:

Live Substation Preparation Drawing For Team Leader
Transmission

3 Days

View Details

Overview:
In this training program, participant will learn about details on AutoCAD and Visio System for technical drawing. Participant will be given a few case study regarding their works and will discuss details on solutions during this program. There will be explanation on measurement procedure and inaccurate measurement of safety & working clearance. This program can helps to reduce any tripping that cause by working clearance.
Objective:

After attending this training program, participants will be able to:

• Do maintenance with correct procedure and avoid tripping cases because of Live Working Clearance.
• Be more competent during preparation of drawing work.


for any enquiries please contact:

1. NAME: AHMAD MAHMOOD
   Email: ahmadm@tnb.com.my

2. NAME: MOHD SALIM NGADINO
   Email: salimn@tnb.com.my
 

Target Participant: Engineers & Technicians
Duration: 3 Days
Language:

Lines And Underground Cable Design And Maintenance / Rekabentuk Dan Senggaraan Talian Dan Kabel Bawah Tanah
Transmission

3 Days

View Details

Overview:
<p justify;"="">Primary Equipment is a major electric appliances that are seen in the electrical substation. The equipment allows electricity operated and controlled use safely. In the context of power transmission, primary equipment placed in electrical substations. Equipment operating at certain voltage levels and have specific uses in order to make the whole system is perfect and safe delivery. The most important of equipment in the system is Circuit Breaker and Power Transformer. Through 132kV high voltage can be lowered by up to 11kV or lower than that and passed on to consumers safely.
In communications and electrical engineering, a transmission line is a specialized cable or other structure designed to carry alternating current of radio frequency, that is, currents with a frequency high enough that their wave nature must be taken into account.

 


Objective:
After attending this training program, participants will be able to:

• define design of overhead lines and characteristics
• define design of cables and characteristics
• handle tools for overhead lines and cables
• practice right methods on overhead lines maintenance
• practice right methods on cables

Target Participant: Technicians
Duration: 3 Days
Language:

Human Resource Minister - Training Provider Award 2007
Role Model Company 2013 for Electrical Training Programmes by Manpower Department (JTM)
Energy Industry Award: Training Institution Excellence 2011

TNB Integrated Learning Solution Sdn Bhd - ILSAS
Jalan IKRAM-UNITEN, Karung Berkunci 205,
43650 Bandar Baru Bangi, Selangor, MALAYSIA

T: (+6) 03-8922 7222 F: (+6) 03-8926 4437 E: infoilsas@tnb.com.my

© 2018 TNB ILSAS