RM 3.6K
KENDALIAN PENCAWANG 33kV Modul 3 – Diagnostik Kerosakan Sistem            SUBSTATION OPERATION 33kV Module 3 – System Fault Diagnosis

KENDALIAN PENCAWANG 33kV Modul 3 – Diagnostik Kerosakan Sistem SUBSTATION OPERATION 33kV Module 3 – System Fault Diagnosis
Distribution

Overview:
This module covers the diagnosis of post fault in the Distribution Network and restoration of supply thereafter. Hence, understanding the nature of fault, the protection system, protection scheme, and protection equipment employed, the types of relays used are of utmost importance in system fault diagnosis.
The careful observation at the Relay & Control Panel of relays operated together with the associated switchgears, the type & fault current registered at protective relays, the accurate reporting of events post fault, isolation of faulted circuit or equipment and restoration of supply forms the gist of this module.

Objective:
*      State and explain the protective system, protective scheme and protective equipment in 33kV Distribution Network
*      Diagnose different types of faults in the 33kV Distribution Network
*      State and explain the function and  device numbering & code of protection relays in Main Distribution Substation
*      State and explain the TNBD Work Instruction & Circulars related to post breakdown, isolation of faulted circuit and restoration of supply

Duration: 3


Request Form





Available Sessions

Upon Request


Other Information
Target Participant: o ELECTRICAL ENGINEERS o TECHNICAL EXECUTIVES o COMPETENT ENGINEERS o SUPERVISING ENGINEERS o TECHNICAL MANAGERS o ELECTRICAL TECHNICIANS o ELECTRICAL CHARGEMAN
Languages: English, Malay


Price

RM RM3000



Related Course

RM 3.6K
DISTRIBUTION NETWORK MASTER PLAN FOR 11KV PLANNER
Distribution

3

View Details

Overview:
This module covers the diagnosis of post fault in the Distribution Network and restoration of supply thereafter. Hence, understanding the nature of fault, the protection system, protection scheme, and protection equipment employed, the types of relays used are of utmost importance in system fault diagnosis.
The careful observation at the Relay & Control Panel of relays operated together with the associated switchgears, the type & fault current registered at protective relays, the accurate reporting of events post fault, isolation of faulted circuit or equipment and restoration of supply forms the gist of this module.
Objective:
*      State and explain the protective system, protective scheme and protective equipment in 33kV Distribution Network
*      Diagnose different types of faults in the 33kV Distribution Network
*      State and explain the function and  device numbering & code of protection relays in Main Distribution Substation
*      State and explain the TNBD Work Instruction & Circulars related to post breakdown, isolation of faulted circuit and restoration of supply

Target Participant: o ELECTRICAL ENGINEERS o TECHNICAL EXECUTIVES o COMPETENT ENGINEERS o SUPERVISING ENGINEERS o TECHNICAL MANAGERS o ELECTRICAL TECHNICIANS o ELECTRICAL CHARGEMAN
Duration: 3
Language: English, Malay

RM 3.6K
Introduction To Metering
Distribution

2

View Details

Overview:
This module covers the diagnosis of post fault in the Distribution Network and restoration of supply thereafter. Hence, understanding the nature of fault, the protection system, protection scheme, and protection equipment employed, the types of relays used are of utmost importance in system fault diagnosis.
The careful observation at the Relay & Control Panel of relays operated together with the associated switchgears, the type & fault current registered at protective relays, the accurate reporting of events post fault, isolation of faulted circuit or equipment and restoration of supply forms the gist of this module.
Objective:
*      State and explain the protective system, protective scheme and protective equipment in 33kV Distribution Network
*      Diagnose different types of faults in the 33kV Distribution Network
*      State and explain the function and  device numbering & code of protection relays in Main Distribution Substation
*      State and explain the TNBD Work Instruction & Circulars related to post breakdown, isolation of faulted circuit and restoration of supply

Target Participant: o ELECTRICAL ENGINEERS o TECHNICAL EXECUTIVES o COMPETENT ENGINEERS o SUPERVISING ENGINEERS o TECHNICAL MANAGERS o ELECTRICAL TECHNICIANS o ELECTRICAL CHARGEMAN
Duration: 3
Language: English, Malay

RM 3.6K
BCRM FOR UPJ
Distribution

3

View Details

Overview:
This module covers the diagnosis of post fault in the Distribution Network and restoration of supply thereafter. Hence, understanding the nature of fault, the protection system, protection scheme, and protection equipment employed, the types of relays used are of utmost importance in system fault diagnosis.
The careful observation at the Relay & Control Panel of relays operated together with the associated switchgears, the type & fault current registered at protective relays, the accurate reporting of events post fault, isolation of faulted circuit or equipment and restoration of supply forms the gist of this module.
Objective:
*      State and explain the protective system, protective scheme and protective equipment in 33kV Distribution Network
*      Diagnose different types of faults in the 33kV Distribution Network
*      State and explain the function and  device numbering & code of protection relays in Main Distribution Substation
*      State and explain the TNBD Work Instruction & Circulars related to post breakdown, isolation of faulted circuit and restoration of supply

Target Participant: o ELECTRICAL ENGINEERS o TECHNICAL EXECUTIVES o COMPETENT ENGINEERS o SUPERVISING ENGINEERS o TECHNICAL MANAGERS o ELECTRICAL TECHNICIANS o ELECTRICAL CHARGEMAN
Duration: 3
Language: English, Malay

Human Resource Minister - Training Provider Award 2007
Role Model Company 2013 for Electrical Training Programmes by Manpower Department (JTM)
Energy Industry Award: Training Institution Excellence 2011

TNB Integrated Learning Solution Sdn Bhd - ILSAS
Jalan IKRAM-UNITEN, Karung Berkunci 205,
43650 Bandar Baru Bangi, Selangor, MALAYSIA

T: (+6) 03-8922 7222 F: (+6) 03-8926 4437 E: infoilsas@tnb.com.my

© 2017 TNB ILSAS