RM 3.6K
132kV Transmission Protection Competency Training - Part 2 (Theory)

132kV Transmission Protection Competency Training - Part 2 (Theory)
Transmission

Overview:
132kV Transmission Protection Competency Training Part 2 (Theory) is referring to the protection scheme itself such as line protection, busbar protection, ICT Interface and application of testing equipment. In this course, the participant can share experience on settings, testing & commissioning, troubleshooting fault case studies, fault investigation and engineering analysis.

Objective:
After attending this course the participants shall be able to:

1. Describe the operating principle of the distance protection function & schemes
2. Describe the Line Protection Scheme
3. Describe the application criteria & operating mode of Autoreclose & Synchronising Check relay
4. Explain how the Operating and communication principle of a Current Differential Protection system.
5. Explain the Operating principle of a Pilot Wire Protection System
6. Describe the working principle of busbar protection in TNB installation
7. Describe the teleprotection channel in Transmission system
8. Explain the proper approach and method to test protection relays and scheme


for any enquiries please contact:

1. NAME: AZIZUDDIN ZAKARIA
   Email: azizuddinz@tnb.com.my

2. NAME: ZALINA SAMSUDIN
   Email: ina63@tnb.com.my
 

Duration: 4 Days


Request Form





Available Sessions

Upon Request


Other Information
Target Participant: Non-Competent Protection


Price

Upon Request



Related Course

RM 3.6K
Live Substation Preparation Drawing For Team Leader
Transmission

3 Days

View Details

Overview:
132kV Transmission Protection Competency Training Part 2 (Theory) is referring to the protection scheme itself such as line protection, busbar protection, ICT Interface and application of testing equipment. In this course, the participant can share experience on settings, testing & commissioning, troubleshooting fault case studies, fault investigation and engineering analysis.
Objective:
After attending this course the participants shall be able to:

1. Describe the operating principle of the distance protection function & schemes
2. Describe the Line Protection Scheme
3. Describe the application criteria & operating mode of Autoreclose & Synchronising Check relay
4. Explain how the Operating and communication principle of a Current Differential Protection system.
5. Explain the Operating principle of a Pilot Wire Protection System
6. Describe the working principle of busbar protection in TNB installation
7. Describe the teleprotection channel in Transmission system
8. Explain the proper approach and method to test protection relays and scheme


for any enquiries please contact:

1. NAME: AZIZUDDIN ZAKARIA
   Email: azizuddinz@tnb.com.my

2. NAME: ZALINA SAMSUDIN
   Email: ina63@tnb.com.my
 

Target Participant: Non-Competent Protection
Duration: 4 Days
Language:

RM 3.6K
Basic Protection For ICT
Transmission

2 Days

View Details

Overview:
132kV Transmission Protection Competency Training Part 2 (Theory) is referring to the protection scheme itself such as line protection, busbar protection, ICT Interface and application of testing equipment. In this course, the participant can share experience on settings, testing & commissioning, troubleshooting fault case studies, fault investigation and engineering analysis.
Objective:
After attending this course the participants shall be able to:

1. Describe the operating principle of the distance protection function & schemes
2. Describe the Line Protection Scheme
3. Describe the application criteria & operating mode of Autoreclose & Synchronising Check relay
4. Explain how the Operating and communication principle of a Current Differential Protection system.
5. Explain the Operating principle of a Pilot Wire Protection System
6. Describe the working principle of busbar protection in TNB installation
7. Describe the teleprotection channel in Transmission system
8. Explain the proper approach and method to test protection relays and scheme


for any enquiries please contact:

1. NAME: AZIZUDDIN ZAKARIA
   Email: azizuddinz@tnb.com.my

2. NAME: ZALINA SAMSUDIN
   Email: ina63@tnb.com.my
 

Target Participant: Non-Competent Protection
Duration: 4 Days
Language:

RM 3.6K
Kompetensi Telecontrol
Transmission

5 Days

View Details

Overview:
132kV Transmission Protection Competency Training Part 2 (Theory) is referring to the protection scheme itself such as line protection, busbar protection, ICT Interface and application of testing equipment. In this course, the participant can share experience on settings, testing & commissioning, troubleshooting fault case studies, fault investigation and engineering analysis.
Objective:
After attending this course the participants shall be able to:

1. Describe the operating principle of the distance protection function & schemes
2. Describe the Line Protection Scheme
3. Describe the application criteria & operating mode of Autoreclose & Synchronising Check relay
4. Explain how the Operating and communication principle of a Current Differential Protection system.
5. Explain the Operating principle of a Pilot Wire Protection System
6. Describe the working principle of busbar protection in TNB installation
7. Describe the teleprotection channel in Transmission system
8. Explain the proper approach and method to test protection relays and scheme


for any enquiries please contact:

1. NAME: AZIZUDDIN ZAKARIA
   Email: azizuddinz@tnb.com.my

2. NAME: ZALINA SAMSUDIN
   Email: ina63@tnb.com.my
 

Target Participant: Non-Competent Protection
Duration: 4 Days
Language:

Human Resource Minister - Training Provider Award 2007
Role Model Company 2013 for Electrical Training Programmes by Manpower Department (JTM)
Energy Industry Award: Training Institution Excellence 2011

TNB Integrated Learning Solution Sdn Bhd - ILSAS
Jalan IKRAM-UNITEN, Karung Berkunci 205,
43650 Bandar Baru Bangi, Selangor, MALAYSIA

T: (+6) 03-8922 7222 F: (+6) 03-8926 4437 E: infoilsas@tnb.com.my

© 2017 TNB ILSAS