RM 3.6K
33kV GIS Cable Termination

33kV GIS Cable Termination
DOSH

Overview:

This course is primarily designed to provide the necessary technical knowledge and skills required to effectively supervise and monitor the project implementation, installation and maintenance works on Medium Voltage (MV: Up to 42kV) cable systems and electrical transformer / switchgear connection equipment on site.

The course methodology emphasize on theory, demonstration and “hand-on” training conducted by experienced and certified trainers.  The well equipped training facilities would enhanced the learning experience. The well designed training structure will guide and highlight to the participants the subject on critical phase in cable preparation to the complete cable accessories assembly and installation This is further enhanced with cable testing to ensure that the completed  installation comply to the required standard.


 



Objective:
. State the cable components and it’s functions
· Able to correlate the cable design and construction parameters
· Identify the types of screen bonding
· Describe the Do’s and Don’ts during the cable handling
· Describe the lesson learned from case studies
· Perform material check with reference to Bill of Material
· Recognise the tools and equipment required to perfom task
· Intepret the assembly and installation instructions
· Participate in cable preparation
· Participate in cable assembly and installation
· Perform Cable Testing

Duration: 3 Days


Request Form





Available Sessions

Upon Request


Other Information
Methodology: discussion, demonstration, practical hands-on
Prerequisites: Participants with related work experience.
Target Participant: Electrical Engineers, Technical Executives, Supervising Engineers, Technical Managers, Electrical Technicians, Electrical Chargeman, Technicians


Price

Upon Request



Related Course

RM 3.6K
33kV GIS Cable Termination
DOSH

3 Days

View Details

Overview:

This course is primarily designed to provide the necessary technical knowledge and skills required to effectively supervise and monitor the project implementation, installation and maintenance works on Medium Voltage (MV: Up to 42kV) cable systems and electrical transformer / switchgear connection equipment on site.

The course methodology emphasize on theory, demonstration and “hand-on” training conducted by experienced and certified trainers.  The well equipped training facilities would enhanced the learning experience. The well designed training structure will guide and highlight to the participants the subject on critical phase in cable preparation to the complete cable accessories assembly and installation This is further enhanced with cable testing to ensure that the completed  installation comply to the required standard.


 


Objective:
. State the cable components and it’s functions
· Able to correlate the cable design and construction parameters
· Identify the types of screen bonding
· Describe the Do’s and Don’ts during the cable handling
· Describe the lesson learned from case studies
· Perform material check with reference to Bill of Material
· Recognise the tools and equipment required to perfom task
· Intepret the assembly and installation instructions
· Participate in cable preparation
· Participate in cable assembly and installation
· Perform Cable Testing

Target Participant: Electrical Engineers, Technical Executives, Supervising Engineers, Technical Managers, Electrical Technicians, Electrical Chargeman, Technicians
Duration: 3 Days
Language:

RM 3.6K
Internal Combustion Engine (ICE) Driver Grade 2*
DOSH

4 Days

View Details

Overview:

This course is primarily designed to provide the necessary technical knowledge and skills required to effectively supervise and monitor the project implementation, installation and maintenance works on Medium Voltage (MV: Up to 42kV) cable systems and electrical transformer / switchgear connection equipment on site.

The course methodology emphasize on theory, demonstration and “hand-on” training conducted by experienced and certified trainers.  The well equipped training facilities would enhanced the learning experience. The well designed training structure will guide and highlight to the participants the subject on critical phase in cable preparation to the complete cable accessories assembly and installation This is further enhanced with cable testing to ensure that the completed  installation comply to the required standard.


 


Objective:
. State the cable components and it’s functions
· Able to correlate the cable design and construction parameters
· Identify the types of screen bonding
· Describe the Do’s and Don’ts during the cable handling
· Describe the lesson learned from case studies
· Perform material check with reference to Bill of Material
· Recognise the tools and equipment required to perfom task
· Intepret the assembly and installation instructions
· Participate in cable preparation
· Participate in cable assembly and installation
· Perform Cable Testing

Target Participant: Electrical Engineers, Technical Executives, Supervising Engineers, Technical Managers, Electrical Technicians, Electrical Chargeman, Technicians
Duration: 3 Days
Language:

RM 3.6K
Steam Driver Grade 1*
DOSH

4 Days

View Details

Overview:

This course is primarily designed to provide the necessary technical knowledge and skills required to effectively supervise and monitor the project implementation, installation and maintenance works on Medium Voltage (MV: Up to 42kV) cable systems and electrical transformer / switchgear connection equipment on site.

The course methodology emphasize on theory, demonstration and “hand-on” training conducted by experienced and certified trainers.  The well equipped training facilities would enhanced the learning experience. The well designed training structure will guide and highlight to the participants the subject on critical phase in cable preparation to the complete cable accessories assembly and installation This is further enhanced with cable testing to ensure that the completed  installation comply to the required standard.


 


Objective:
. State the cable components and it’s functions
· Able to correlate the cable design and construction parameters
· Identify the types of screen bonding
· Describe the Do’s and Don’ts during the cable handling
· Describe the lesson learned from case studies
· Perform material check with reference to Bill of Material
· Recognise the tools and equipment required to perfom task
· Intepret the assembly and installation instructions
· Participate in cable preparation
· Participate in cable assembly and installation
· Perform Cable Testing

Target Participant: Electrical Engineers, Technical Executives, Supervising Engineers, Technical Managers, Electrical Technicians, Electrical Chargeman, Technicians
Duration: 3 Days
Language:

Human Resource Minister - Training Provider Award 2007
Role Model Company 2013 for Electrical Training Programmes by Manpower Department (JTM)
Energy Industry Award: Training Institution Excellence 2011

TNB Integrated Learning Solution Sdn Bhd - ILSAS
Jalan IKRAM-UNITEN, Karung Berkunci 205,
43650 Bandar Baru Bangi, Selangor, MALAYSIA

T: (+6) 03-8922 7222 F: (+6) 03-8926 4437 E: infoilsas@tnb.com.my

© 2017 TNB ILSAS