Courses

Technical Aspect Standards And Aspects Of Heavy Vehicle Operation
OSHE

2

View Details

Overview:

Objective:


Target Participant: E07-E17
Duration: 2
Language:

Technical And Operation Of Renewable Energy Installation
Power & Energy

3 Days

View Details

Overview:
This course is design to stretch participant the technical and operation aspects of Distributed Generation installation typically use Renewable Energy sources mainly the Photovoltaic System. Renewable Energy Meters are also being discussed in this three days course.

“Learning by doing” is a basic principle adopted in this training. Participant will be taken through the vast experience of training by the trainers. The emphasis is on participants continuing participation in ensuring the ultimate success of the course.
Objective:

Upon completion of this course, participants will be able to:

• Read RE meter, to plan, identify, and propose connection point and perform T&C complying to RE Act
• Identify various type of interconnection of solar Photovoltaic (PV) less than 425kWp to TNB's network based on RE guidelines
• To install PV meter and witness anti-islanding test of the solar installation based on RE guidelines
• Replace faulty RE meter based on Process Standardization Improvement (PSI)


for any enquiries please contact:

1. NAME: IR. WAN AMINUDDIN BAKI BIN ABDUL KHALID
   Email: aminuddinak@tnb.com.my

2.NAME: ANNAS BIN AHMAD SALLEH
   Email: annass@tnb.com.my
 



Target Participant: >12-72 kW - Estimator, Unit Perkhidmatan Jangka, >72-425kW - Station Planner, Pasukan Operasi Meter - Unit Pengurusan Hasil, Operation & Maintenance Technician & TNB Distribution Division
Duration: 3 Days
Language:

TAMATAN KABEL GIS 33kV 33kV GIS CABLE TERMINATION
Distribution

3

View Details

Overview:
This course is primarily designed to provide the necessary technical knowledge and skills required to effectively supervise and monitor the project implementation, installation and maintenance works on Medium Voltage (MV: Up to 42kV) cable systems and electrical transformer / switchgear connection equipment on site.
 
The course methodology emphasize on theory, demonstration and “hands-on” training conducted by experienced and certified trainers.  The well-equipped training facilities would enhanced the learning experience. The well designed training structure will guide and highlight to the participants the subject on critical phase in cable preparation to the complete cable accessories assembly and installation This is further enhanced with cable testing to ensure that the completed  installation comply to the required standard.
Objective:
*                  State the MV cable components and it’s functions
*                  Able to correlate the cable design and construction parameters
*                  Identify the types of screen bonding
*                  Describe the Do’s and Don’ts during cable handling
*                  Describe the  lesson learned from case studies
*                  Perform material check with reference to Bill Of Material
*                  Recognise the tools and equipment required to perform task
*                  Interpret the assembly and installation instructions
*                  Participate in cable preparation
*                  Participate in cable assembly and installation
*                  Perform Cable Testing

Target Participant: o ELECTRICAL ENGINEERS o TECHNICAL EXECUTIVES o SUPERVISING ENGINEERS o TECHNICAL MANAGERS o ELECTRICAL TECHNICIANS o ELECTRICAL CHARGEMAN o TECHNICIANS
Duration: 3
Language: English, Malay

Human Resource Minister - Training Provider Award 2007
Role Model Company 2013 for Electrical Training Programmes by Manpower Department (JTM)
Energy Industry Award: Training Institution Excellence 2011

TNB Integrated Learning Solution Sdn Bhd - ILSAS
Jalan IKRAM-UNITEN, Karung Berkunci 205,
43650 Bandar Baru Bangi, Selangor, MALAYSIA

T: (+6) 03-8922 7222 F: (+6) 03-8926 4437 E: infoilsas@tnb.com.my

© 2018 TNB ILSAS